Introduction to safety devices for overhead traveling bridge cranes
Nov 21, 2023
(1) The comprehensive error of the overload limiter should not be greater than 5%, and the number of lifting and lifting weight can be recorded.
(2) When the load reaches 90% of the rated lifting capacity, an alarm signal should be issued; when it is 100-110% of the rated lifting capacity, the power supply for the lifting control of the hanging object should be automatically cut off through interlock control.