1 ton jib crane installation inspection items

1. Install the cantilever crane according to the design requirements and keep records.
2. Check whether the tightening points of each screw meet the regulations. If there is any looseness, tighten it.
3. Check whether all parts of the cantilever crane are complete and whether they are installed correctly.
4. Lubricate the electric hoist, driver and other equipment and locations with oil.
5. Check the insulation layer again before connecting the cantilever to the power supply. If there is no abnormality for sevencrane 1 ton jib crane for sale, you can connect the power supply for inspection and adjustment.

Trial operation of industrial 1 ton jib crane price
The test operation of the cantilever crane includes full load test operation, static load test and dynamic load operation. Just conduct a trial lifting test on the cantilever crane as required.

Advantages of jib cranes
Column-type top manufacturer 1 ton jib crane system is a relatively economical solution for heavy-duty materials. It can be used to lift larger loads and meet higher production efficiency requirements. The lifting capacity can reach 5 tons and the span can reach 7 meters. Its advantages are as follows:

Easy to move: The ultra-light cantilever crane uses a copper bushing and high-strength brass graphite to achieve easy rotation and precise positioning;

Safety: Weld-free, one-time molded bracket accessories provide a strong guarantee for safety;

Full rated load application: 15% of the rated lifting capacity of the jib crane is the total weight of the hoist and hoist trolley, and 25% is the impact load, which effectively ensures the efficient use of the jib lifting capacity;

Easy to install: single tie rod, both ends of the electric 1 ton jib crane cost are right-hand threaded for easy leveling; all components including the stop trolley are connected by bolts