บ้าน > บล็อก > Rail-changing artifact: portable rail gantry crane officially put into use

Rail-changing artifact: portable rail gantry crane officially put into use

Date: 2024-01-29
แบ่งปันเรา:

What’s so great about the track-changing artifact?

On April 13, the gantry crane on tracks made its debut during spring intensive repairs and was officially put into use at Tanggongta Station on the Dazhun Line. In the rail changing or switch replacement operation, the most arduous and dangerous operation is the transfer of old and new rails. Due to the restricted access of some large equipment in on-site operations, most of them rely on manpower to move gradually through crowbars, and sevencrane gantry crane on tracks wholesale are a good solution. solution.

The working principle of the “track changing artifact”:
The overall design of the top choice for industrial gantry crane on tracks is light and simple. The main body is made of aluminum alloy. The rail-specific hanging clamp uses the classic lever principle to fix the rails and switches. It is also equipped with a DC motor and is powered by lithium batteries. During operation, change the length of the rail or turnout as needed, arrange portable rail gantry cranes at appropriate positions at both ends of the rail, place rail clamps on the rails, operate the electric hoist remote control, lower the hook, and the two cranes cooperate to lift, and can be lifted by pushing The hoisting hoist can achieve lateral movement of the rail, or it can also achieve longitudinal movement by pushing the rail and relying on the sliding bearing at the rail clamp.

Advantages of “track changing artifact”:

CE approved gantry crane on tracks for sale is not restricted by the environment, has a simple structure, is easy to operate, is less subject to environmental constraints, has a larger operating range, and is suitable for lines with narrow sites. To achieve cost reduction and efficiency increase, the use of lifting machinery and equipment is efficient and convenient, saves manpower, reduces labor intensity, saves 20 to 30 minutes of operating time, saves 3 to 6 manpower, reduces production costs, and achieves cost reduction and efficiency improvement. As of April 27, the european standard gantry crane on tracks suppliers has assisted in the replacement of 2 sets of frog cores and the replacement of 6 rails, which has greatly improved the efficiency of loading and unloading operations and on-site safety factors, and promoted the realization of equipment security.