ElThe 1 ton wall mounted jib crane consists of a bracket, jib installation, swivel installation and electric hoist (electric chain hoist). The bracket is fixed on the wall or steel structure column and can be rotated according to user needs. The rotating part is divided into manual rotation and electric rotation. Electric hoists (electric chain hoists) are installed on cantilever rails and are used to lift heavy objects. Cantilever cranes are widely used in light and small lifting applications in mines, workshops, assembly lines, warehouses, and docks. The utility model has the advantages of novel structure, reasonableness, simplicity, convenient operation, sensitive rotation, light weight, and sensitive load movement. The operation of this machine is realized through the handle control button, which controls the lifting and horizontal walking of the sevencrane 1 ton wall mounted jib crane. double girder eot crane price is quite competitive in the current market, making it an attractive choice for many industrial applications. It is very important to perform daily inspections on double girder overhead cranes to ensure their safe operation and extended service life. Here are some key daily inspection steps:
Inspect the limit switch: Ensure that the lifting height limiter, travel limit switch and interlocking mechanisms perform normally, safely and reliably.
Inspect the main components: Check the opening enlargement, torsional deformation, plate hook bushing wear, plate hook mandrel wear, etc., to ensure that they meet safety requirements.
Inspect the wire rope: Check the wear and corrosion of the grúa puente de dos vigas wire rope to ensure that the number of broken wires in one twist is less than 10% of the total number of wires, without broken ends, and no obvious thinning.
Inspect the drum: Check whether the drum has cracks, and whether the connection and fixation are loose. Whether the drum wall wear is less than 20% of the original wall thickness; whether the number of safety circles is not less than 2 circles.
Check the brake: Check whether the brake of the industrial overhead crane is free of cracks, looseness, and severe wear, whether the brake clearance is equal on both sides and of appropriate size, and whether there is sufficient braking force.
Check the pulley and slider: Check whether the power slider or pulley is in good contact with the slide line, and whether the movement of the large vehicle cable drum is coordinated with the running speed of the large vehicle.
Check the hook: Make sure that the hook of the industrial overhead crane can rotate flexibly and the fixing nut must not be loose.
Check the power supply voltage: Check the power supply voltage before driving to ensure that the voltage is not less than 85% of the rated voltage.
Check the controller: Before operating the industrial overhead crane, turn all controller handles to zero according to the operating procedures, close the door switch, and sound the alarm.
Check the track and operating range: Check whether there are people working or debris and obstacles on the track, ground, and operating range.
Check the brake performance: Carefully check the brake condition of the lifting and luffing mechanisms on a daily basis, and observe the opening of the brake shoe and the wear of the friction element brake skin.
Check the reducer: Mainly check whether the grúa puente de dos vigas is leaking oil. If there is abnormal noise in the box during operation, open the box cover for inspection.
Check the pulley: Check whether the wear of the groove bottom exceeds the standard, whether the cast iron pulley has cracks, and for the balance wheel of the pitch mechanism pulley group, check its rotation flexibility.
Through these daily inspections, accidents can be effectively prevented, equipment failures can be reduced, equipment operation rate can be improved, and maintenance costs can be reduced. We offer a range of double girder eot cranes at varying price points, ensuring that customers can find the perfect fit for their specific needs and budget.