Gantry crane safety management countermeasures

Date: 2024-01-29
Compartenos:

In view of the current status and existing problems of boat gantry crane safety management, combined with the experience of special rectification activities, the author’s team started from the perspective of construction management and proposed that gantry cranes “build systems, strengthen standards, and prevent extreme weather management” (establishing and improving management systems, strengthening on-site standardized management, and preventing extreme weather management) ) safety management countermeasures.

(1) Establish and improve the safety management system. Units using sevencrane boat gantry crane wholesale should formulate corresponding management regulations in accordance with the national management system for special equipment, and establish and improve the company’s own safety management system. The first is to equip full-time equipment management personnel, establish equipment management technical files for all lifting machinery in the enterprise, accurately record the relevant technical parameters and repair and maintenance status of the equipment, and scientifically formulate the frequency of operation, maintenance, inspection and maintenance of the equipment. , Arrange maintenance time reasonably to ensure that each equipment is in normal condition. The second is to strictly implement the management system for admission, maintenance, installation and disassembly, to ensure that managers can detect equipment problems in a timely manner, solve safety hazards in a timely manner, and ensure the good operation of lifting machinery and equipment. The third is to strictly implement job responsibilities in response to phenomena such as sick working during the use of equipment, and strictly assess personnel who work in violation of regulations and give blind orders.

(2) Strengthen on-site standardized management. In accordance with the national standard “General Gantry Crane” GB/T14406, Gantry Crane Safety Technical Operating Procedures and other regulatory requirements, we must do a good job in on-site standardized management. First, implement dynamic management of special equipment. For top choice for industrial boat gantry crane on-site inspection, daily maintenance, safety inspections, operator induction, operator skills training and safety education, a “fixed time, fixed personnel, fixed content” method must be adopted to carry out inspections to form a special equipment and Dynamic ledger of workers. The second is to implement standardized management of environment and equipment. Safety assessments should be carried out when selecting locations for densely populated places, and a safe distance should be maintained from equipment; standardized guardrails and pedals should be set up for passages and platforms; safety hooks and wire rope rope arrangement devices should be used; ensure that the tracks are straight and connecting bolts are tight; distribution boxes and cables should be set up and protected accordingly. The third is standardized management of safety protection devices. Cranes and lifting trolleys should be equipped with stroke limiters in the running direction; operating mechanisms and luffing mechanisms should be equipped with buffers and stop devices; lifting machinery should be equipped with lifting capacity limiters.

(3) Management of extreme weather prevention: First,CE approved boat gantry crane for sale users must strengthen linkage cooperation with meteorological departments, sign meteorological cooperation agreements, obtain weather warning information in a timely manner, and do safety precautions. Second, when the wind speed is greater than level 6 or lifting operations are stopped, the crane should be parked at the designated location to ensure that the automatic rail clamp of the traveling trolley is clamped to the track, and at the same time set up cable wind ropes. Third, after learning of the severe weather forecast, a comprehensive inspection of the wind and lightning protection measures of the gantry crane should be carried out so that the crane can be parked in a safe location and in a ready state to prevent wind and floods. Fourth, after severe weather, personnel should be promptly organized to check whether the european standard boat gantry crane suppliers, cables, and lines are intact, and any problems found should be dealt with in a timely manner.