ElThe 1 ton wall mounted jib crane consists of a bracket, jib installation, swivel installation and electric hoist (electric chain hoist). The bracket is fixed on the wall or steel structure column and can be rotated according to user needs. The rotating part is divided into manual rotation and electric rotation. Electric hoists (electric chain hoists) are installed on cantilever rails and are used to lift heavy objects. Cantilever cranes are widely used in light and small lifting applications in mines, workshops, assembly lines, warehouses, and docks. The utility model has the advantages of novel structure, reasonableness, simplicity, convenient operation, sensitive rotation, light weight, and sensitive load movement. The operation of this machine is realized through the handle control button, which controls the lifting and horizontal walking of the sevencrane 1 ton wall mounted jib crane. double girder overhead crane consists mainly of the bridge structure, trolley, hoisting mechanism, running mechanism, and electrical equipment. Its key features include a lightweight design, low headroom, and reduced wheel pressure, making it cost-effective for facilities by reducing building investment. This crane type is commonly used in industries such as machinery manufacturing, component assembly, and warehouse material handling.
Equipped with frequency control for both the trolley and crane movement, the double beam eot crane ensures smooth, reliable, and safe operation. Its rational structural design minimizes wear and tear, reducing maintenance demands during use. Additionally, the unique steel pin connection not only enhances the stability and reliability of the structure but also allows for quick assembly. The flexible leg components of the double beam eot crane can be easily disassembled for transport, making it convenient when moving between job sites.
Technical specifications, such as load capacity (ranging from 3 to 800 tons), span (customizable between 5 to 110 meters), and lifting height (up to 110 meters), can be adjusted to suit various industrial needs. Its working level is A3-A4, and the working environment temperature is in the range of -25℃-40℃. The double girder overhead traveling crane design, with the hook positioned between the two main girders, allows for an increased lifting height, enhancing operational efficiency. Optional features such as maintenance platforms and trolley platforms can be added, enabling easier and safer access for maintenance personnel to other parts of the facility, making upkeep more convenient and efficient.
This combination of design flexibility and robust performance makes double girder overhead cranes an optimal solution for complex lifting operations in a wide range of industrial settings.