Προσφορά 3 βημάτων
Το Blog μας
Τα νέα μας για τα προϊόντα και οι γνώσεις μας στον κλάδο
Σπίτι > heavy duty top running crane factory
Introduction to safety devices for overhead traveling bridge cranes
Nov 21, 2023
(1) The comprehensive error of the overload limiter should not be greater than 5%, and the number of lifting and lifting weight can be recorded. (2) When the load reaches 90% of the rated lifting capacity, an alarm signal should be issued; when it is 100-110% of the rated lifting capacity, the power supply for the lifting control of the hanging object should be automatically cut off through interlock control.
Διαβάστε περισσότερα
Transmission form of electric top-running overhead crane and trolley transfer mechanism
Nov 21, 2023
The most common crane used in the workshop - the electric overhead traveling crane is the most common type of crane used in the workshop. Equipped with CD and MD hoists, they are light and small cranes. The lifting capacity range is generally between 1-16t and the span is between 6-25 meters. For larger tonnage lifting capacity and span, it is best to choose an electric double-girder crane. The use environment is controlled within the range of -30-+40℃.
Διαβάστε περισσότερα
Driving method of the operating mechanism of the overhead traveling bridge crane
Nov 21, 2023
The trolley operating mechanism of the overhead traveling bridge crane is the transport mechanism of the entire crane, including the motor, controller, coupling, transmission shaft, reducer, angular bearing box and trolley wheels, etc.
Διαβάστε περισσότερα